// About Revenant

Everyone fixed the airframe. Nobody fixed the motor.

Defense drones got NDAA-compliant airframes, flight controllers, and cameras. But the motors still rely on magnets and assemblies that trace back to China. Most Blue UAS platforms. Most tactical FPV builds. The propulsion system was always the gap nobody closed.

We started Revenant Autonomous to fix that.

// What Drives Us

Built Different. On Purpose.

Uncompromised Origin

We trace every magnet, every lamination, every bearing back to its source. If we can't prove where it came from, it doesn't go in our motors.

Mission Over Margin

Our motors are engineered for the operator, not the accountant. Reliability at altitude, torque in saltwater, survival on impact. That's what we optimize for.

Vertically American

Design, winding, assembly, testing, and quality control all happen under one roof in Morganton, NC. No contract manufacturers. No offshore subassembly.

Blue Ridge Built

We're in Morganton because defense manufacturing belongs in American communities. The Blue Ridge Mountains are in our backyard.

// Manufacturing

Morganton, North Carolina

One facility. One standard. Every motor designed, wound, assembled, tested, and shipped from the foothills of the Blue Ridge Mountains.

01
Design
02
Prototype
03
Test
04
Manufacture
05
QC
// Our Story

From Discovery to Factory Floor

2024

Follow the Magnets

Our founding team dug into the defense drone supply chain and kept hitting the same wall: the motors. 90% of rare-earth magnets in drone motors trace back to China. Blue UAS platforms, tactical FPV, heavy lift. Didn't matter. The motor was always the weak link, and nobody was fixing it.

2025

Design the Motors

We brought together motor engineers and supply chain people and started designing BLDC motors for UAV, UUV, UGV, and USV platforms. Every material sourced from allied countries. Every design decision driven by one question: can we trace this?

2026

Build the Factory

We set up in Morganton, North Carolina. Manufacturing facility is under construction. DFARS compliance program is targeting certification ahead of the January 2027 deadline. First motor lines are moving from design into production.

2026

Prove the Compliance

AS9100 certification in progress. NIST SP 800-171 controls being implemented for CUI handling. Building the compliance foundation so our customers don't have to worry about it.

Ready to secure your propulsion supply chain?

Whether you're a defense prime, a program office, or an integrator building the next generation of unmanned platforms - we're ready to talk.

Request a Quote

We typically respond within 24 hours.